Substrate
Load-bearing mineral and porous substrates: concrete, cement, masonry, stone, render, unglazed ceramic, plasterboard, fibre cement, concrete brick, timber and roofing felt — including old existing buildings and even listed facades, as long as they are consistently load-bearing.
Boundary condition: dry, firm and load-bearing, free of loose material, oil, grease, dust, mould, salt and loose old coatings. Procedure: visual and wipe test for chalking, scratch and tap test for hollow areas, and if in doubt a pull-off or cross-cut test on the primer.
Pre-treatment
Remove loose and non-load-bearing old coatings, clean the surface and fill any defects. Measure substrate moisture: below 4%, below 2.5% for concrete.
Procedure: moisture measurement with a suitable meter; if in doubt, wait until the substrate is ready to receive flooring/coating. Boundary condition: repairs must be fully dry before application.
Primer
PSC 250 T ECB BASIC B, ready to use, approx. 0.1 mm. Curing around 24 hours, recoatable after 2 to 3 hours without sanding.
Boundary condition: no thinning is intended; mix the entire container contents thoroughly before use. The primer is essential for the adhesion of all subsequent layers and can be applied directly to corroded but stable surfaces.
Basis: System data PSC 250 TApplication method
Airless spraying is preferred. Alternatively, brush or roller with 8 to 14 mm pile length.
Boundary condition: only these application methods are approved. Other methods alter the layer thickness and therefore the function of the coating.
Airless — nozzle size
To be selected according to the spray equipment manufacturer's specification and the product. The equipment filter must be removed before application.
Constraint: the filter must be removed because the coating contains ceramic vacuum nanospheres — it would hold them back and alter the spray pattern.
Airless — spray pressure
120 bar maximum.
Constraint: maintain an even distance and overlapping passes so the film thickness stays uniform. Higher pressure increases overspray and reduces film thickness.
Number of coats
Three layers in a fixed sequence: primer, functional coat, top coat. The functional coat is applied in two passes.
Constraint: the number of coats follows from the required dry film thickness, not from appearance. Opacity is not a measure of function.
Wet film thickness per coat
Functional coat 0.5 mm per pass. Primer approx. 0.1 mm, top coat 0.1 to 0.2 mm.
Constraint: the two passes of the functional coat together give 1.0 mm. If either pass is applied thinner, the finished build-up will be short of thickness.
Basis: System data PSC 250 TTotal dry film thickness
Approx. 1.2 mm across all three layers: primer approx. 0.1 mm, functional coat 1.0 mm, top coat 0.1 to 0.2 mm.
Constraint: this applies to the complete system build-up. A partial application is not a thinner build-up, but a different one.
Basis: System data PSC 250 TIntermediate drying
The next coat can be applied as soon as the surface is touch-dry — after approximately 2 hours. For the functional coat, 4 to 8 hours.
Constraint: recoatable without sanding. These figures apply to the climatic conditions given in block 03; colder or damper conditions extend every time given.
Basis: System data PSC 250 TThrough-drying / load-bearing capacity
Curing approx. 24 hours per layer, drying at least 24 hours. Maturing time of the finished build-up 24 hours.
Constraint: the fresh coating must be protected from rain and frost for at least 6 hours.
Basis: System data PSC 250 T